通过分析宁波港域码头升级改造工程的水文地质条件,阐述了沉桩、灌注桩及锚岩桩的施工工艺流程,并归纳了施工中的注意事项和质量控制要点,使港口满足经济与市场的发展需求。
Through analyzing hydrological conditions of Ningbo harbor upgrading transformation engineering,the paper analyzes construction technology procedures of sinking pile,bored pile and anchor-socketed pile,and summarizes construction matters and quality control points,so as to make the harbor meet economic and market demands.