基于悬链线理论的跨接软管安装计算 被引量:3

Calculation of the Jumper Hose Installation Based on Catenary Theory
下载PDF
导出
摘要 考虑到海洋石油平台之间和浮式生产储油装置(FPSO)与单点系泊系统之间的跨接软管成本昂贵,并且在安装过程中极易受损,为保证软管在安装过程中的完整性,提升安装作业效率,降低安装成本,采用悬链线理论对跨接软管安装过程进行分析,建立求解跨接软管长度、连接点角度、受力、高差以及弯曲半径、重心位置等关键控制参数的悬链线方程。在LF13-2油田开发项目跨接软管的安装过程中的应用表明,该方法快捷有效,可作为跨接软管安装控制的理论依据。 The jumper hose between offshore oil platforms or floating production storage and offloading units(FPSO) and single point mooring system is very expensive and easily damaged during the installation process. In order to ensure the integrity of hose and improve installation efficiency and reduce the installation cost,the catenary theory was used to analyze the installation process,and a series of equations were deduced to solve the key control parameters such as jumper hose length,angle and force on hose end,height difference between hose control points,bending radius and the center of gravity. The method was proved to be very efficient and quick during the jumper hose installation in LF13-2 oilfield development project,so it can provide theoretical basis for jumper hose installation.
出处 《船海工程》 北大核心 2017年第1期126-129,133,共5页 Ship & Ocean Engineering
基金 海洋石油工程股份有限公司陆丰13-2Ⅱ期油田开发项目
关键词 跨接软管 悬链线理论 安装计算 海洋石油平台 jumper hose catenary theory installation calculation offshore oil platforms
  • 相关文献

参考文献10

二级参考文献41

共引文献165

同被引文献32

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部