基于混合整数规划法的自然崩落法放矿计划优化 被引量:10

Optimization of drawing scheduling based on mixed integer programming in block cave mining
原文传递
导出
摘要 放矿计划是自然崩落法矿山生产过程中最重要的环节.针对传统手工编制放矿计划随意性大及出矿品位不均衡,在对其进行科学系统的分析基础上,本文运用混合整数规划法解决自然崩落法放矿计划优化问题.以计划期内与目标品位偏差最小为目标函数,综合考虑矿量、品位、放矿速率、崩落指数、排产指数等约束条件,构建放矿计划优化的混合整数规划模型,并在MATLAB环境下用YALMIP编写模型语言调用CPLEX求解器进行求解,使品位波动降低18%,进而得到最优短期放矿计划方案.经实例验证,此方法科学可行,对充分发挥自然崩落法的优越性和提高矿产资源的回收率具有重要的理论和现实意义. Drawing scheduling is the most important process in block cave mining. The traditional analysis process of drawing scheduling is random and inefficient without system scientific analysis. A mixed integer programming method was proposed in this paper to solve the optimization problem of drawing scheduling. Taking the ore reserve quantity,ore grade,drawing index and production scheduling index as the constraints and the grade fluctuation as the objective function,a drawing scheduling optimization model was built based on the mixed integer programming method. It was solved with the CPLEX solver invoked by model language that was programmed with YALMIP in MATLAB for a certain copper mine. Finally,the optimal arrangement scheme of drawing scheduling was obtained. It is proved that this model is scientific and feasible,the grade fluctuation reduces by 18%,and compared with the traditional,this drawing scheduling saves costs by meeting the desired production quantity more closely and reducing the employee time spent on preparing schedules.
出处 《工程科学学报》 EI CSCD 北大核心 2017年第1期23-30,共8页 Chinese Journal of Engineering
基金 中央高校基本科研业务费资助项目(2016zzts450) 国家自然科学基金资助项目(41572317)
关键词 自然崩落采矿法 混合整数规划 放矿 计划 优化 block caving method mixed integer programming drawing scheduling optimization
  • 相关文献

参考文献3

二级参考文献14

  • 1高永涛.用期望体理论预计损失贫化[J].金属矿山,1993,22(10):23-25. 被引量:1
  • 2高永涛.放出期望体理论与电算模拟放矿的相似性[J].北京科技大学学报,1994,16(3):201-206. 被引量:5
  • 3王大勋,长沙矿山研究院院刊,1992年,12期,130页
  • 4周爱民,长沙矿山研究院院刊,1992年,10期,2页
  • 5马拉霍夫 G M,崩落矿块的放矿,1958年
  • 6Topal E,Kuchta M,Newman A. Extensions to an efficient optimization model for long-term production planning at LKAB's kiruna mine[M].Cape Town:APCOM,2003.289-294.
  • 7Dieting T. PC-BC:A block cave design and draw control system[A].2000.305-335.
  • 8Guest A,VanHout GJ,Von JA,Scheepers LF. An application of linear programming for block cave draw control[A].2000.
  • 9Dieting T. Computational considerations for production scheduling of block cave mines[A].Santiago,2004.135-140.
  • 10Rubio E,Dieting T. Block cave production planning using operations research tools[A].Santiago,2004.141-149.

共引文献17

同被引文献72

引证文献10

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部