摘要 在现有道路交通条件下,实现干道上信号协调控制能有效提高主干道的通行能力。分析了城市道路交叉口的平均延误时间、道路通行能力和信号配时的数学模型和计算方法。以某城市主干道为例,在对某条主干道11个主要信控交叉口进行了大量交通量调研的基础上,选取了有代表性的三个交叉口作为协调控制交叉口。根据该道路的几何结构特征,在调查实际数据的基础上,提出"分时段分方向、设置半周期时长"的干道信号协调控制方法,应用Synchro仿真软件建立基于原控制参数的干道信号协调控制系统;同时,在应用Synchro优化各个独立交叉口信号控制参数的基础上,建立了基于优化控制参数的信号协调控制系统。 In the existing road traffic conditions,the realization of trunk road signal coordination and control can effectively improve the capacity of the trunk road. Taking a city main road as an example,based on a large amount of traffic investigation on 11 major intersections of a main road,three representative intersections are chosen as the coordinated control intersection. According to the geometric structure of the road and the investigation of actual data,this paper proposes a coordinated control method of trunk signal based on sub-period direction and half cycle time,and applies the Synchro simulation software to build the main road signal coordination control system based on the original control parameters. At the same time,the signal coordination control system based on the optimal control parameters is established on the basis of the Synchro optimization signal control parameters of the individual intersections.
作者 曹凌峰
出处 《内蒙古公路与运输》 2017年第1期52-54,61,共4页 Highways & Transportation in Inner Mongolia
关键词 交通工程 协调控制系统 仿真模型 优化设计 traffic engineering coordinated control system the simulation model the optimization design
  • 相关文献

参考文献2

二级参考文献13

  • 1徐雪松,景玉军,何珍梅.城市交通信号配时的免疫算法[J].华东交通大学学报,2007,24(1):53-56. 被引量:2
  • 2Webster F V. Traffic Signal Settings[J].Road Research LaboratoryTechnical Paper,1958,39(1),1-39.
  • 3Vincent R A, Mitchell A I, Robertson D I. User guide to TRANSYT version 8[R].Transport and Road Research Laboratary, Research Report LR666,1980.
  • 4Clement S J, Anderson J M. Traffic Signal Timing Determination: the Cabal Model[A].2nd IEE International Conference on Genetic Algorithms in Engineering Systems: Innovations and Applications[C]. Glasgow,UK,1997,63-68.
  • 5GUO J G, QIU M H, CHEN B T. Study on the Secondary starting model used in a large Y-shaped intersection [J. Applied Mechanics and Materials, 2013,253-255 : 1797-1802.
  • 6CLEMENT S J, ANDERSON J M. Traffic signal timing determination:the cable model [ C //2 TEEE International Confer- ence on Genetic Algorithms in Engineering System: Innovations and Application, 1997: 1009-1013.
  • 7中华人民共和国住房和城乡建设部.CJJ]7.2012城市道路工程设计规范[S].北京:人民交通出版社,2012.
  • 8伍雄斌,郭建钢,程婉燕.基于遗传算法的单一路口智能体优化控制[J].福建农林大学学报(自然科学版),2008,37(2):221-224. 被引量:6
  • 9胡佩峰,田宗忠,袁振洲,贾顺平.交通运行管理中的可变绿波带优化(英文)[J].交通运输系统工程与信息,2011,11(1):61-72. 被引量:10
  • 10郭彦东,李欢,李夏苗.城市主干路信号配时优化实证研究[J].交通运输系统工程与信息,2011,11(A01):167-174. 被引量:5

共引文献46

同被引文献18

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部