摘要
结合五强溪水电厂扩机项目的实例,分析了额定水头选择的一般原则,针对水轮机运行水头变幅大时不稳定情况,叙述了如何进行经济技术方案比较确定合适额定水头的过程。
Combining with examples of Wuqiangxi extension project, this paper analyzes the general principles of the selection of rated head. It focus on when the turbine operating head amplitude is large, instabilities occuring, the process of how to compare the economic and technical scheme determine the appropriate rated head.
出处
《湖南电力》
2017年第1期46-49,共4页
Hunan Electric Power
基金
基金项目:湖南发展委:发展能源(2016)982号
关键词
额定水头
选择
五强溪水电厂
扩机项目
rated head selection
Wuqiangxi Hydropower Plant
extension project