330MW热电联产机组汽包锅炉等离子点火系统技术改造 被引量:2

Technical reformation of plasma ignition system for steam drum boiler of 330 MW cogeneration unit
下载PDF
导出
摘要 针对某330MW热电联产电厂原有等离子点火系统存在启不了弧或拉弧运行过程中易断弧等一系列问题进行深入分析研究,结合现场实际对等离子发生器、工艺管道系统、DCS组态及电气控制系统进行优化改造,实践表明改造后的等离子运行可靠性得到了较大的提高,缩短了机组启动并网时间,经济效益显著。 In view of the existing problems of the original plasma ignition system of a 330 MW cogeneration power p lan t , such a series of problems are analyzed and studied in the paper. Combined with the a ctual , plasma generator, process piping system, DCS configuration and electrical control system are optimized. Practice shows that the improved plasma operation reliability has been greatly improved, and the starting time of the unit is shortened. It has achieved significant economic benefits.
作者 张斌 李春建
出处 《湖南电力》 2017年第1期73-76,共4页 Hunan Electric Power
关键词 330MW 热电联产机组 等离子 点火系统 发生器 330 MW cogeneration unit plasma ignition system generator
  • 相关文献

参考文献8

二级参考文献24

共引文献61

同被引文献4

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部