3[1]SHAW J P. The design of a distributed knowledge_based approach for the intelligent manufacturing information system [D]. PhD thesis,West Lafayette, IN:Purdue Univ.,1984.
4[2]UPTON D M. The operation of large computer controlled manufacturing system[D].PhD thesis,West Lafayette, IN: Shool of Industrial Engg.,Purdue Univ.,Dec.1988.
5[3]TILLEY K J,WILLIAMS D J.Modeling of communications and control in an auction-based manufacturing control system[C]. Proc. Of 1992 IEEE Int'l Conf. On Robotics and Automation, Nice, France.
6[4]JAYAMOHAN M S, RAJENDRAN C.New dispatching rules for shop scheduling: a step forward[J].International Journal of. Production Research, 2000,38(3):563-586.
7[5]VEPSALAINEN A P J,MORTON,T E.Priority Rules for job shops with weighted tardiness costs[J]. Management Science,1987,33:1035-1047..
8[6]CARROLL D C.Heuristic sequencing and multiple component jobs[D]. Unpublished PhD dissertation, Massachusetts Institute of Technology, Cambridge, MA.1965.
9[7]BAKER K R,KANET J J.Job shop scheduling with modified due dates[J]. Journal of Operations Management, 1983,4:11-22.
10[8]BAKER K R,BERTRAND J W M.A dynamic priority rule for sequencing against due-dates[J]. Journal of Operations Management, 1982,20:27-45.