摘要
2014年12月中国实验快堆(CEFR)满功率运行期间,汽轮-发电机的发电功率达到14.2 MW,距离设计值20MW还有较大差距。本文通过运行监测数据与设计参数比较,进行理论分析计算,给出了CEFR发电效率较低的影响因素。
When China Experiment Fast Reactor(CEFR) running in full power in December 2014,the power of turbo-generator reached 14.2 MW,which is far lower than the designed power 20 MW.Through the comparison between actual running monitor data and designed parameters,this article conducts the theory analysis and calculation,then gives the effects of CEFR's low generating efficiency.