摘要
2016年9月初马钢10^#高炉出现崩料现象,恢复困难导致高炉失常。通过认真分析原因,高炉及时采取措施,内外部结合、上下部调整进行处理,半个月后高炉逐步恢复正常生产水平。
The material collapsed on Ma Steel No.10# blast furnace in Sep.of 2016.And it was difficult to recover balst furnace production.Through studying and anylyzing seasons the proper measurments have been taken which integrated inside and outside measurments and adjusted top and bottom parameters.After half month the furnace's production was recoverd back to normal level gradually.
出处
《安徽冶金科技职业学院学报》
2016年第4期13-16,共4页
Journal of Anhui Vocational College of Metallurgy and Technology
关键词
高炉
崩料
失常
生产
Blast Furnance
materal collapse
abnormal conditions
produciton