国外EPCC项目临时验收风险识别及应对措施 被引量:3

Risk identification and response on provisional acceptance of oversea EPCC projects
下载PDF
导出
摘要 尽早识别并分析评估项目活动中的潜在风险,提出风险应对措施,从而预留一定资源作为项目管理风险储备,是项目管理的关键活动之一。讨论了国外EPCC项目临时验收的几类主要潜在风险,包括备品备件移交、业主人员培训、尾项消项、性能考核等,列举并分析了各类风险出现的可能原因,并提出了相应的风险应对措施。分析表明,应在项目的规划阶段对临时验收中存在的上述风险进行详细评估,以选择适当的应对措施,并在项目执行过程中对临时验收的风险进行再评估。 It is one of the key activities in project management to identify, analyze and evaluate the potential risks in project activities at the earliest time, and consequently propose the response plan and reserve the due resources. This article dis- cusses the main types of potential risks in duration of provisional acceptance of oversea EPCC project, including transfer- ring of spare parts, training owner' s employees, liquidation of punch list, performance test-run and etc. It lists and ana- lyzes the occurrence reasons for each type of risk, and suggests the corresponding response. It is concluded by analysis that the detailed evaluation on the risks should be performed during the initializing process and the planning process of the project to finalize the proper responsive measures, also the revaluation on the provisional acceptance related risks should be performed during the executing process.
作者 范海成
出处 《石油工程建设》 2017年第1期89-92,共4页 Petroleum Engineering Construction
关键词 EPCC项目 临时验收 风险识别 风险应对 EPCC project provisional acceptance risk identification risk response
  • 相关文献

参考文献3

同被引文献19

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部