基于模糊关键链的施工企业进度管理研究 被引量:1

Research on schedule management of construction enterprises based on fuzzy critical chain
下载PDF
导出
摘要 在项目实施中,不确定性因素的存在造成项目的完工与进度计划有偏差。本文采用三角模糊数描述工序持续时间的不确定性,并计算工序的期望工期。在此基础上进行缓冲区的计算,通过设置缓冲区制定的关键链有效的缩短了计划工期,保证项目的顺利完工。
出处 《工程建设》 2017年第1期97-99,共3页 Engineering Construction
  • 相关文献

参考文献3

二级参考文献36

  • 1刘士新,宋健海,唐加福.资源受限项目调度中缓冲区的设定方法[J].系统工程学报,2006,21(4):381-386. 被引量:70
  • 2NEWBOLD R C.Project Management in the Fast Lane:Applying the Theory of Constraints[M].St.Lucie Press,New York,1998.
  • 3ASHTIANI B,JALALI G R,ARYANEZHAD M B,et al.A New Approach for Buffer Sizing in Critical Chain Scheduling[C]//IEEM 2007,2007 IEEE International Conference on Industrial Engineering and Engineering Management,Piscataway,Computer Society,2007:1037-1041.
  • 4YANG L X,FU Y,LI S Q,et al.A Buffer Sizing Approach in Critical Chain Scheduling with Attributes Dependent[C]//Wireless Communications,Networking and Mobile Computing,2008 International Conference on Wireless Communications,Piscataway:Computer Society,2008:1-4.
  • 5LUONG D L,ARIO O.Fuzzy Critical Chain Method for Project Scheduling Under Resource Constraints and Uncertainty[J].International Journal of Project Management,2008,26:688-698.
  • 6ZHAO Z Y,YOU W Y,LV Q L.Applications of Fuzzy Critical Chain Method in Project Scheduling[C]//Natural Computation,ICNC' 08,Proceedings-4th International Conference on Natural Computation,ICNC 2008,Piscataway:Computer Society,2008,6:473-477.
  • 7KAUFMAN A,GUPTA M M.Introduction to Fuzzy Theory and Application[J].Van Nostrand Reinhold,1985,351:264-278.
  • 8Goldratt E M.Critical Chain,1997.
  • 9Luong Duc Longa,Ario Ohsato.Fuzzy critical chain method for project scheduling under resource constraints and uncertaintyInternational Journal of Project Man-agement,2008.
  • 10Willy Herroelen,Roel Leus.On the merits and pitfalls of critical chain schedulingJournal of Operator Theory,2001.

共引文献25

同被引文献17

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部