摘要 针对土压平衡顶管机基本动作需求设计了液压主顶系统,对液压主顶系统的工况进行分析,得出液压主顶系统的总顶力以及油缸最大顶力。根据油缸最大顶力进一步计算了液压主顶系统的主要参数,并通过方案对比对液压主顶系统的同步回路、方向控制回路和供油方式进行设计。对液压主顶系统的压力损失和工作温度进行验算,结果表明:该液压主顶系统的压力损失和工作温度在适宜范围内,系统可正常工作。 The main hydraulic jacking system was designed for earth pressure balance pipe jacking machine aiming at its functional requirements. Its working condition was analyzed for calculating total jacking force and maximum hydraulic jacking force of the main hydraulic jacking system. The parameters of the hydraulic system were calculated according to the maximum hydraulic jacking force, and the synchronous circuit, direction control circuit and oil supply mode were designed by comparison. The pressure loss and working temperature of the main hydraulic jacking system were checked. The results show that the pressure loss and the working temperature of the hydraulic system are proper.
出处 《机床与液压》 北大核心 2017年第4期85-88,共4页 Machine Tool & Hydraulics
关键词 液压主顶系统 回路设计 顶管机 Main hydraulic jacking system Curcuit design Pipe jacking machine
  • 相关文献

参考文献6

二级参考文献19

  • 1于颖,徐宝富,奚鹰,宋木生.软土地基土压平衡盾构切削刀盘扭矩的计算[J].中国工程机械学报,2004,2(3):314-318. 被引量:22
  • 2孙荣权,傅莉,郭易,李伟.旋转式连续换向阀[J].液压与气动,2001,25(3):36-37. 被引量:4
  • 3杨扬,龚国芳,胡国良,杨华勇.模拟盾构机推进液压系统泵站集成设计[J].机床与液压,2006,34(4):118-120. 被引量:11
  • 4王洪新,傅德明.土压平衡盾构掘进的数学物理模型及各参数间关系研究[J].土木工程学报,2006,39(9):86-90. 被引量:104
  • 5官忠范.液压传动系统[M].北京:机械工业出版社,1999..
  • 6Xu Yongfu, Sun De'an, Sun Jun, et al. Soil distur- bance of Shanghai silty clay during EPB tunneling [J]. Tunnelling and Underground Space Technology, 2003, 18(5) : 537-545.
  • 7Chen R P, Zhu J, Liu W, et al. Ground movement induced by parallel EPB tunnels in silty soils[J]. Tunnel-ling and Underground Space Technology, 2011, 26 (1): 163-171.
  • 8Suwansawat S, Einstein H H. Artificial neural networks for predicting the maximum Surface settlement caused by EPB shield tunneling [J]. Tunnelling and Underground Space Technology, 2006, 21 (2) : 133-150.
  • 9Takuji Yamamoto, Suguru Shirasagi, Shinya Yama- moto, et al. Evaluation of the geological condition ahead of the tunnel face by geostatistical techniques using TBM driving data [J]. Tunnelling and Underground Space Technology, 2003, 18(2/3) : 213-221.
  • 10Fukui K, Okubo S. Some attempts for estimating rock strength and rock mass classification from cutting force and investigation of optimum operation of tunnel boring machines [J]. Rock Mechanics and Rock Engineering. 2006, 39(1): 25-44.

共引文献110

同被引文献18

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部