摘要
以阳煤集团二矿龙门西集中回风巷掘进施工中的出矸系统为例,重点对岩巷扒渣机出矸作业线进行简介说明,并与耙岩机的进度、效益等进行对比分析,以期对类似大断面施工中的出矸系统提供参考。
Taking the gangue system of drivage construction in central return air roadway of Longmen West of 2# Coal Mine of Yangquan Coal Industry Group as an example,brief introduction to gangue production line of mucking loader and comparative analysis of the progress and efficiency of scraping loader were given,hoping to provide references for similar gangue system of large section.
作者
刘真
LIU Zhen(Shanxi Hongsha First Construction Co., Ltd., Yangquan 045000, Shanxi, Chin)
出处
《能源与节能》
2017年第3期7-8,19,共3页
Energy and Energy Conservation
关键词
扒渣机
作业线
掘进效果
mucking loader
operation line
tunneling effect