摘要
江西某化工厂采用高级氧化-厌氧-好氧-混凝处理相结合的主体工艺处理2,3-二氯吡啶生产过程中产生的废水。对工艺选择的依据、工艺流程、工艺参数及运行效果进行了介绍。运行结果表明,废水经该工艺处理后,出水水质达到《污水综合排放标准》(GB 8978—1996)的三级标准,达到当地污水处理厂进水水质要求。
The combined advanced oxidation-anaerobic-aerobic-coagulation treatment process has been used fortreating the wastewater from 2,3-dichloropyridine production in a chemical plant in Jiangxi Province,China. Thebasis of technological selection,process flow,technological parameters,and running effects are introduced. Therunning results show that after the wastewater has been treated by this way,the water quality of effluent meets therequirements for the third level standard specified in the Integrated Wastewater Discharge Standards(GB 8978—1996),and meets the requirements for influent water quality specified by local wastewater treatment plants.
出处
《工业水处理》
CAS
CSCD
北大核心
2017年第2期98-102,共5页
Industrial Water Treatment
基金
江西省教育厅科技落地计划项目(GJJ12433)
南昌市对外科技合作与成果转化推广计划项目(2013HZCG001)