5Jerald J,Asokan P,Saravanan R.Simuhaneous scheduling of parts and automated guided vehicles in an FMS environment using adaptive genetic algorithm[J].International Journal of Advanced Manufacturing Technology, 2006,29(5 ) : 584-589.
6Huang Jiayen,Yao Mingjong.A genetic algorithm for solving the economic lot scheduling problem in flow shops[J].Intemational Journal of Production Research,2008,46(14) :3737-3761.
7Johnson S M.Optimal two-and three-stage production schedules with set-up times included[J].Naval Research Logistics Quarterly, 1954,1(1 ):61-68.
8Hejazi S R,Saghafian S.Flowshop-scheduling problems with makespan criterion:A review[J].International Journal of Production Research, 2005,43 (14) : 2895-2929.
9Murata T,Ishibuchi H,Tanaka H.Multi-objective genetic algorithm and its applications to flow shop seheduling[J].Computers and Industrial Engineering, 1996,30(4 ) : 957-968.
10Reeves C.A genetic algorithm for flow shop sequeneing[J].Computers and Operations Research, 1995,22( 1 ) :5-13.