1Anthony D.Songer, Keith R.Molenaar.Project Characteristics for Successful Public-Sector Design-Build[J].Joumal of Construction Engineering and Management,1997,123:34-40.
2Keith R.Molenaar, Anthony D.Songer. Model for Public Sector Design-Build Project Selection [J].Journal of Construction Engineering and Management, 1998:467-479.
3Florence Yean Yng Ling,Canny Lee Kian Chong.Design and Build Contractors Service Quality in Public Projects in Singapore[J]. Building and Environment, 2005,40:815-823.
4Florence Yean Yng Ling,Edwin Fu Kang Leong.Performance of Design-Build Projects in terms of Cost, Quality and Time:Views of Clients, Architects and Contractors in Singapore [J].The Australia Journal of Construction Economics and Building.Vol.2 No.1 37-46.
5Edmond W.M. Lam, Albert P.C. Chan,Daniel W.M. Chan. Determinants of Successful Design-Build Projects [J].Journal of Construction Engineering and Management,2008,134:333-341.
6Roth, M.An Empirical Analysis of United States Navy Design/Build Contracts. Master's thesis, University of Texas at Austin,1995.
7Mark Konchar,Victor Sanvido.Comparison of U.S. Project Delivery System [J].Journal of Construction Engineering and Management, 1998(124): 435-444.
8Ibbs C.William et al. Project Delivery Systems and Project Change: Quantitative Analysis [J].Journal of Construction Engineering and Management,2003:392-387.
9Darren R.Hale at al. Empeirical Conprarison of Design/ Build and Design/Bid/Build Project Delivery Methods [J].Joumal of Construction Engineering and Management, 2009,7(135):579-587.
10Pramen P.Shrestha et al.Performance Comparison of Large Design-Build and Design-Bid-Build Highway Projects[J].Journal of Construction Engineering and Management,2012,138:1-13.