期刊文献+

时移地震在SAGD蒸汽腔数值模拟中的应用 被引量:7

Application of Time-Lapse Seismic in SAGD Steam Chamber Simulation
下载PDF
导出
摘要 针对油藏三维空间动态变化模拟精度较低的难题,运用时移地震约束下的油藏数值模拟方法,模拟稠油热采时油藏蒸汽腔形态三维空间动态变化情况。研究结果表明:时移地震约束下的数值模拟方法可以精细模拟出SAGD蒸汽腔发育形态在三维空间里的动态变化情况,油藏开采历史数据也得到了较好的拟合。油藏观察井测温资料及实际生产数据验证了模拟结果的准确性。研究成果对稠油热采油藏开发调整决策及开发调整方案编制具有指导意义。 Due to the relatively low simulation accuracy of reservoir 3D performance,reservoir numerical simulation with time-lapse seismic constraint is used to simulate the dynamic geometry of steam chamber during thermal recovery in heavy-oil reservoir. Research indicates that the 3D SAGD steam chamber geometry is finely modeled by reservoir numerical simulation with time-lapse seismic constraint and the historical reservoir data is also well matched. The corresponding simulation result is also in good agreement with that of temperature test data in observation well and actual production data. This research could provide certain guidance for the program adjustment and preparation of adjustment program in heavy-oil reservoir with thermal recovery.
出处 《特种油气藏》 CAS CSCD 北大核心 2016年第6期86-89,共4页 Special Oil & Gas Reservoirs
基金 国家科技重大专项"高精度地球物理勘探技术研究与应用"(2011ZX05019)
关键词 时移地震 SAGD 蒸汽腔 油藏数值模拟 历史拟合 地震拟合 超稠油油藏 time-lapse seismic SAGD steam chamber reservoir numerical simulation history matching seismic matching super-heavy oil reservoir
  • 相关文献

参考文献9

二级参考文献138

共引文献210

同被引文献93

引证文献7

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部