摘要 面对日益趋紧的资源环境约束,针对河南省地域、资源、需求特点,通过构建河南6大区域电网跨区输电线路的电力、电量约束,建立了考虑跨区输电的多区域河南省综合资源战略规划模型(HNIRSP),研究实现河南各地区资源的整体优化路径。河南省电力综合资源规划电力布局情景分析结果显示,除去EPP后,2014—2030年河南省需要新增装机需求总量为96950MW,与装机空间平衡结果相比,减少装机容量32250MW,可直接减少全社会投资约108.6亿元,减排CO_2约11 627.0万t,减排SO_2约37.7万t,减排NO_x约32.8万t。 In the face of increasingly strained resources and environment, and against the geographic, resources and demand characteristics of Henan province, and through construction of power constraints of transregion grid transmission lines in six areas of Henan province, a Henan province integrated resource strategic planning model (HNIRSP) considering transregion power trasmission is established to study the regional resources overall optimization path of Henan province. The scenario analysis of HNIRSP shows that after removing the efficiency power plants(EPP), the needed installed capcacity of Henan province during 2014-2030 will reach 96 950 MW, deacreasing 32 250 MW compared with the balanced results, consequently reducing the whole social investment of 10.86 billion yuan, and reducing the emissions of CO2, SO2 and nitrogen oxides by 116.27 million tons, 377 000 tons and 328 000 tons, respectively.
出处 《中国电力》 CSCD 北大核心 2017年第3期174-179,共6页 Electric Power
关键词 综合资源战略规划 电力布局 需求侧管理 能效电厂 integrated resource strategic planning electricity power layout demand side management efficiency power plant
  • 相关文献

参考文献6

二级参考文献51

共引文献67

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部