KST水电站工程表孔溢洪道模型试验空化数分析

Analysis of Cavitation Number in Model Test of Table Hole Spillway of KST Hydropower Station
下载PDF
导出
摘要 通过建立表孔溢洪道水工模型试验,在不同的水位下对模型进行观测,试验结果显示:将渐变段从20m增加到40m,流态在设计水位时,水流流态平顺,在校核水位时,水翅强度明显变弱;溢流堰段和抛物线段沿程水面线和压强分布正常,局部存在一定负压。通过对空化数计算得出:在设计水位1 305.00m时,沿程空化数最小,且不会发生空化空蚀破坏。 Through the establishment of table hole spillway hydraulic model tests,we observed the model under different water levels,experimental results show that: we increased the gradual change section from 20 m to40m,when the water level was in the design of flow pattern,the flow regime is smooth,when the water level was in the check water level,water-wing strength was significantly weaken;Flow profile and pressure along the water of weir section and parabolic segment was distribute normaly,there was a negative pressure.We calculated the cavitation number and conclude:when the design water level was 1305.00 m,cavitation number along the way was the least,and the damage of cavitation and cavitation erosion would not occur.
作者 葛彩莲
出处 《吉林水利》 2017年第3期28-30,共3页 Jilin Water Resources
关键词 模型试验 收缩角 压强分布 空化数 model test contract Angle pressure distribution cavitation number
  • 相关文献

参考文献3

二级参考文献9

  • 1罗启北.台阶式溢洪道上的水流分析[J].贵州工学院学报,1996,25(3):64-69. 被引量:6
  • 2陈松滨.海南大隆水利枢纽初步设计[R].广州:中水珠江规划勘测设计有限公司,2003.
  • 3沈正.广东徐闻大水桥溢洪道水工模型试验研究[R].广州:珠江水利科学研究院,2002.
  • 4吴持恭.水力学(下册,第二版)[M].北京:高等教育出版社,1982:35-36.
  • 5王建平,何贞俊.海南大隆水利枢纽水工模型试验研究[R].广州:珠江水利科学研究院,2003.
  • 6南京水利科学研究院.SL155-95水工(常规)模型试验规程[S].北京:中国水利水电出版社,1995.5-39.
  • 7Yasuda Y,Takahashi M,Ohtsu T.Energy Disspition of Skimming Flow on Stepped Channel Chutes[A].Proceeding of the 29th IARH congress,Beijing,2001.
  • 8[苏]斯里斯基(С·М·Слисскнй) 著,毛世民,杨立信.高水头水工建筑物的水力计算[M]水利电力出版社,1984.
  • 9吴宪生.台阶式溢流坝水力特性初探[J].四川水力发电,1998,17(1):73-77. 被引量:23

共引文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部