摘要
分析缓倾斜矿体、倾斜矿体以及急倾斜矿体的采矿方法,基于煤矿工程施工安全管理原则探讨施工安全管理手段,为提高企业的生产能力和高效安全生产奠定理论基础。
This paper analyzes the inclined orebody, and inclined orebody mining method of steep orebody, the principle of the construction safety management of coal mine engineering construction safety management measures based on, lay the theoretical foundation for improving the production capacity and high efficiency and safe production.
出处
《机械管理开发》
2016年第12期140-141,共2页
Mechanical Management and Development
关键词
采矿工程
采矿技术
施工安全
mining engineering
mining technology
construction safety