麻家梁矿14205辅运顺槽工作面的锚杆支护管理技术研究 被引量:1

Research on Bolt Support Management Technology for 14205 Auxiliary and Parallel Working Face of Majialiang Coal Mine
下载PDF
导出
摘要 介绍了麻家梁煤矿14205辅运顺槽工作面掘进、支护及施工管理等情况,从工序安排、管理制度、施工工序和工艺等方面探讨了影响掘进速度的因素,提出了改进设备、优化工序组织、科学管理、提高人员素质等几方面的对策,以便促进掘进施工的过程中缩短时间、提高效率。 This paper introduces 14205 Majialiang coal mine auxiliary transport crossheading face excavation,supporting and construction management, from the process arrangement, management system, the factors influencing the driving speed of the construction process and technology, improved equipment, optimization of process organization,scientific management, improve the quality of personnel and other measures the process of excavating construction so as to be able to shorten the time in the future to improve the efficiency.
作者 贺晨伟
出处 《机械管理开发》 2017年第2期21-23,共3页 Mechanical Management and Development
关键词 煤巷掘进 因素分析 锚网喷联合支护 coal roadway drivin factor analysis anchor net spray combined support
  • 相关文献

参考文献3

二级参考文献1

  • 1郭励生 勾攀峰 等.煤巷锚杆支护[M].徐州:中国矿业大学出版社,1999..

共引文献67

同被引文献4

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部