摘要
景德镇电厂#1、#2机组在2011年分别投入运行,经过近几年运行和调整,机组安全性和经济性得到较大提高,由于电网峰谷负荷相差大,为提高在低负荷期间机组经济性,施行在低负荷时三台磨煤机运行,本文就三台制粉时的炉内稳燃、磨组运行方式、运行措施、经济性等进行探讨。希望对同类机组在低负荷期间,制粉系统优化调整有一定的参考和借鉴作用。
The # 1, # 2 generating units of Jingdezhen Power Plant were put into operation respectively in 2011. After the operation and adjustment in recent years, the safety and economy of the unit have been greatly improved. Due to the large difference between peak load and peak load, This paper discusses the operation mode, operation method, economy and so on of three pulverized coal pulverized coal combustion. It is hoped that the optimization and adjustment of the pulverizing system will have some reference and reference effect for similar units during low load.
出处
《锅炉制造》
2017年第2期8-11,共4页
Boiler Manufacturing
关键词
低负荷
直吹制粉系统
磨煤机电耗
一次风机电耗
low load
direct blowing pulverizing system
pulverizer power consumption
primary fan power consumption