文章结合皖电东送工程供应商生产流程实际和特点,分析了特高压钢管塔加工流程和资源,根据厂家普遍生产流程,通过查找钢管塔加工关键链,制定加工进度计划,提出了进度控制措施,对过程进度动态管控,以保障钢管塔加工进度。
Based on the actual characteristics of the production flow of the supplied equipment for power transmission from Anhui province to the east, this paper analyzes the processing and resources of ultra-high voltage steel tube tower. By seeking the key points for processing the tower in a general case, the author puts forward the scheduling and measures for a dynamic control.
出处
《设备监理》
2017年第2期41-45,共5页
Plant Engineering Consultants
关键词
特高压钢管塔
加工流程
生产进度
控制
ultra-high voltage steel tube tower, process flow, scheduling, control