摘要
我国东南沿海是世界上台风影响最多的地区,据中国天气气候事件统计,台风灾害损失为全年自然灾害经济损失之首。针对我国经济建设高速发展,在建工程项目众多的状况,如何减少在建工程中的人员和物资财产损失显得尤为重要。文章从强台风"莫兰蒂"袭击厦门的灾后处置现场经验出发,实证分析了强台风及其暴雨的破坏力对在建工程影响的几个主要因素,并基此提出了灾前预防的方案及灾后处理的主要着手点,强调了人的主观能动性在灾前灾后的重要作用。
China's southeast coast is the world's most affected areas of typhoons,According to China's weather and climate events statistics,typhoon disaster losses for the first year of economic losses of natural disasters. In view of the rapid development of China's economic construction,many construction projects in the situation,how to reduce personnel and material property losses in construction projects is particularly important. This article from the scene of the attack in Xiamen post disaster disposal in the strong typhoon " Meranti" out of experience,focuses on several main factors affecting the destructive typhoon winds and storms in the construction and carries out an empirical analysis,and puts forward the main points of pre disaster prevention and disaster postprocessing scheme the. And emphasizes people's subjective initiative plays an important role in the post disaster before the disaster.
出处
《福建建筑》
2017年第2期92-94,共3页
Fujian Architecture & Construction
关键词
在建工程
强台风
预防措施
灾后恢复
Construction project
Violent typhoon
Preventive measure
Disaster recovery