摘要
主要探讨控制系统验收测试的要求,包括工作内容、涉及的各参与方及其责任、文档要求及各测试阶段的主要目标等。
The requirements of DCS acceptance and test were discussed, which covers work scope and respon- sibilities of all parties involved and the documents for testing and the major tasks for each test stage.
出处
《化工自动化及仪表》
CAS
2017年第3期297-300,共4页
Control and Instruments in Chemical Industry
关键词
DCS验收测试
工作内容
责任
DCS acceptance and test, work scope, responsibilities