摘要
针对某市某地铁隧道开挖施工方案的研究,文章采用BIM技术从定性和定量的角度,分析比较了在两种开挖方式下,隧道的围岩稳定性、工艺难度、施工进度以及材料消耗量等的差异,从而优化选择全断面开挖方案,并通过现场数据监测分析,验证了方案的合理性。
In order to study of the construction scheme of subway tunnel excavation in Chongqing,based on qualitative and quantitative analysis,BIM technology is employed to analyze and compare the stability of surrounding rock,process difficulty,construction schedule and material consumption in two kinds of excavation ways. As a result,full section excavation scheme is optimized and the rationality of the scheme is verified by field data monitoring and analysis.
出处
《洛阳理工学院学报(自然科学版)》
2017年第1期26-30,共5页
Journal of Luoyang Institute of Science and Technology:Natural Science Edition
关键词
CD法
全断面法
监控量测
BIM
CD method
full section method
monitoring measurement
BIM