冶炼厂钢筋混凝土烟囱改造方案选定和实施

Selection and Implementation of Renovation Scheme of Reinforced Concrete Stack in Smelter
下载PDF
导出
摘要 随着冶炼厂环境集烟系统的升级改造,烟囱的使用环境从干烟气变为湿烟气,原有钢筋混凝土烟囱的防腐设计无法满足改造后的烟气条件,必须对原钢筋混凝土烟囱内壁进行防腐改造。本文从工期、施工可靠性和经济性等方面比较了3个方案,并确定最终施工方案采用固斯特PSM聚合物硅酸盐防腐蚀体系。根据施工方案的具体实施情况,提出了相应的调整方案。 With the upgrading and renovation of fugitive gas collecting system in smelter, the operational environment of stack is changed from dry gas into wet gas. The anti-corrosion design of the original reinforced concrete stack cannot meet the conditions of flue gas after renovation, anti-corrosion renovation must be carried out for the inner wall of the original reinforced concrete stack. The paper compares three schemes from the aspects of time limit of project, construction reliability and economy, it determines that the final construction scheme uses Koster polymer/silicate anti-corrosion system. According to the specific implementation of the construction scheme, the paper puts forwards the relevant adjustment scheme.
出处 《有色冶金设计与研究》 2017年第1期44-47,共4页 Nonferrous Metals Engineering & Research
关键词 钢筋混凝土烟囱 环境集烟 湿烟气 固斯特聚合物硅酸盐防腐蚀体系 施工方案 reinforced concrete stack fugitive gas collecting wet flue gas Koster polymer/silicate anti-corrosion system construction scheme
  • 相关文献

参考文献2

二级参考文献5

共引文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部