摘要
介绍了京南水利枢纽工程及厂房尾水渠左侧护坡、挡墙的结构概况,分析了2014年5月厂房尾水渠左侧护坡发生坍塌的原因,提出了在坍塌段抛填石块的应急处理方案,并论述了模袋混凝土护坡永久修复加固设计方案及施工措施。
An introduction was made on the Jingnan Hydraulic Complex and the structure of its left revetment and retaining wall at tailwater of powerhouse. Landslide occurred at the left revetment in May of 2014. The author ana- lyzed the causes, put forward the emergency measure of dumping rockfill at the damaged section, and discussed the reinforcement design scheme of mold bag concrete revetment as well as the construction measures.
出处
《广西水利水电》
2017年第1期60-63,共4页
Guangxi Water Resources & Hydropower Engineering
关键词
厂房尾水护坡
坍塌
应急处理
模袋混凝土护坡
设计
施工
京南水利枢纽
Tailwater revetment of powerhouse
landslide
emergency treatment
mold bag concrete revetment
design
construction
Jingnan Hydraulic Complex