摘要
介绍了青山沟水库的工程概况及存在的渗漏、坝高不足、防浪墙损坏等问题。分析了该工程出现渗漏的原因,提出了土工布防渗、灌浆防渗和钢筋混凝土面板防渗3个除险加固方案,通过比较,选定钢筋混凝土面板防渗方案,并介绍了方案的设计和实施效果。
An introduction was made on the general information of Qingshangou Reservoir, including the existing problems such as seepage, insufficient dam height and damaged wave wall. The author analyzed the causes for seep- age and presented three reinforcement schemes of geotextile, grouting and steel concrete slab. Steel concrete slab scheme was selected based on comparison. The author also presented the design and reinforcement effects.
出处
《广西水利水电》
2017年第1期64-66,共3页
Guangxi Water Resources & Hydropower Engineering
关键词
渗漏
除险加固
钢筋混凝土面板
堆石坝
青山沟水库
Seepage
reinforcement
steel concrete slab
rockfill dam
Qingshangou Reservoir