摘要
随着电网风电装机规模的不断增大,风电场是否具有低电压穿越功能直接影响风电并网安全。目前风电场低电压穿越测试的方法主要以设备测试为主,即对单台风力发电机组进行抽检测试,验证整个风电场具备低电压穿越能力。采用单台测试设备检验风电场低电压穿越能力效率较低,且不能验证整个风电场其他设备的低电压穿越能力。通过短路试验方式来验证风电场低电压穿越能力,并在通辽地区进行现场试验验证。试验结果表明采用短路试验的方法能够更好、更快地开展低电压穿越测试工作,确保大规模风电接入后的电网安全稳定运行。
With the continued large-scale wind power connected to the grid,grid security and stability is one of the elements that can not be ignored,especially if the wind farm has a low voltage ride through( LVRT) capabilities. Currently wind farm LVRT test methods based mainly on equipment testing,that a single wind turbines for sampling tests to verify the wind farm can be achieved. This method is simple but with limitations. This paper presents a new approach based on the short-circuit tests to verify the wind farm LVRT by the comparison of experiment in Tongliao. The results demonstrate that short-circuit test method can develop LVRT work better and faster,also ensure safe and stable operation of power grid.
作者
戈阳阳
蔡志远
马少华
董鹤楠
GE Yangyang CAI Zhiyuan MA Shaohua DONG Henan(Shenyang University of Technology, Shenyang, Liaoning 110023, China Electric Power Research Institute of State Grid Liaoning Electric Power Co., Ltd., Shenyang, Liaoning 110006, China)
出处
《东北电力技术》
2017年第2期11-14,共4页
Northeast Electric Power Technology
关键词
风电场
低电压穿越
短路试验
wind farm
low voltage ride through
short-circuit test