期刊文献+

基于EPC模式矿井火灾治理工程项目风险管理

Risk management of coal mine fire control engineering project based on EPC
下载PDF
导出
摘要 通过对矿井火灾治理工程EPC模式矿井火灾治理工程项目自身特点分析,运用系统分解法、头脑风暴法及类似工程经验对矿井火灾治理工程的风险因素进行总结和归类,并对基于EPC模式矿井火灾治理工程在合同谈判、物资采购、工程分包、工程施工不同阶段存在的资金风险、质量风险、安全风险、工期进度风险采取不同的应对策略,为EPC模式矿井火灾治理工程的顺利实施提供保障。 Based on the characteristics of EPC coal mine fire control engineering project,with the application of system decomposition,brainstorming and similar engineering experience,risk factors were summarized and classified,and different coping strategies were applied for financial risk,quality risk,security risk and schedule risk in different stages of contract negotiations,procurement,subcontracting,project construction of the coal mine fire control engineering project based on EPC pattern,to provide protection for smooth implementation of the project.
作者 张青松
出处 《煤炭工程》 北大核心 2017年第3期146-148,共3页 Coal Engineering
关键词 EPC模式 矿井火灾治理 风险识别 风险控制 EPC coal mine fire control risk identification risk control
  • 相关文献

参考文献3

共引文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部