摘要
仁恒海河广场一期公建项目位于天津市海河沿岸,由于该项目地理位置特殊、周边环境复杂且与地铁出入口相连、基坑面积大、深度深,使得该项目地下工程的施工较为复杂,该工程采用"中顺边逆"施工方法,在保障基坑安全的同时加快了施工进度。对"中顺边逆"的施工工艺流程及主要施工节点的处理方法进行了详细介绍。
Yanlord Riverside Plaza as a public construction project is located in Tianjin Haihe River coast,due to the location of the project with complex surrounding environment and the subway entrance is connected,foundation excavation with large area and depth,the construction of the underground project is more complex. The middle-clockwise and side-anticlockwise method is adopted in the project,which ensures the safety of the foundation excavation and accelerates the construction schedule. The construction process and the main construction node processing method of middle-clockwise and sideanticlockwise method are introduced.
出处
《施工技术》
CAS
北大核心
2017年第5期43-47,共5页
Construction Technology
关键词
深基坑
中顺边逆法
钻孔灌注桩
施工技术
deep foundation excavation
middle-clockwise and side-anticlockwise method
bored piles
construction