摘要
以延延高速黄河特大桥薄壁空心高墩液压自爬模施工为例,详细阐述了液压自爬模施工操作流程、关键工序施工控制措施,并重点介绍了在高墩大跨联体刚构结构形式下对液压自爬模施工工艺改进的做法,对类似工程结构施工具有借鉴意义。
Taking the construction of hydraulic self-climbing form for the hollow thin-walled high piers of Yellow River Bridge in Yan' an-Yanchang Expressway as an example, this paper expounded the construction operation process and key working procedure construction control measures of hydraulic self-climbing form, focusing on improving the construction technology of hydraulic self-climbing form under the form of coupling rigid frame bridge with high pier and long span. It could be referred by similar engineering structure construction.
作者
张常轩
Zhang Changxuan(China Railway 14th Bureau Group 3^rd Engineering Co. Ltd. , Yanzheu Shandong 272100, China)
出处
《铁道建筑技术》
2016年第12期11-14,32,共5页
Railway Construction Technology
基金
山东省科技创新第三批项目(201331901019)
关键词
高墩大跨
联体刚构
薄壁空心高墩
液压自爬模
操作流程
工艺改进
high-pier and long-span
coupling rigid frame
hollow thin-walled high pier
hydraulic self-climbing form
operation process
technology improvement