摘要
以徐州彭城发电厂三期工程为例,通过对项目建设期间水土流失监测指标的筛选,为建设单位提供准确的监测数据,为竣工验收提供依据。
Taking the third phase project of power plant in Pengcheng of Xuzhou as an example, the monitoring index of soil erosion during the construction of the project was chosen to provide an accurate monitoring data for the construction unit and provide reference for the final acceptance of the project.
作者
马进
邢亚
李帆
MA Jin et al(Xuzhou Branch of Jiangsu Province Hydrology and Water Resources Investigation Bureau, Xuzhou, Jiangsu 221006)
出处
《农业灾害研究》
2016年第10期44-45,共2页
Journal of Agricultural Catastrophology
关键词
电厂
水土流失
监测指标
Power plant
Soil erosion
Monitoring index