6 - 1 Operation Status of HIRFL in 2013
6 - 1 Operation Status of HIRFL in 2013
-
1Yuan Youjin,Xia Jiawen,Yang Jiancheng,Yang Weiqing,Mao Lijun,HIRFL operation group.6-1 Operation Status of HIRFL in 2015[J].IMP & HIRFL Annual Report,2015(1):259-260.
-
2Zhang Zhouli,Shi Aimin,Sun Liepeng,Xu Xianbo,Shi Longbo,Li Chenxing,Wang Wenbin,Ma Wei,Lu Liang,He Yuan.6-5 Introduction to Operation Status of ADS Injector IIR FQ System in 2015[J].IMP & HIRFL Annual Report,2015(1):266-266.
-
3Li Jinyu Wang Pingzhi Kang Long Liu Huiping.6 - 17 Operation Status of 320 kV Platform for Multi- discipline Research with Highly Charged Ions[J].IMP & HIRFL Annual Report,2012(1):260-260.
-
4Li Jinyu Wang Pingzhi Kang Long Ma Xiaoming Yan Tailai.Operation Status of 320 kV Multi-discipline Research Platform for Highly Charged Ions in 2011[J].IMP & HIRFL Annual Report,2011(1):231-231.
-
5Li Jinyu, Feng Yucheng, Cao Yun, Wang Hui, Ma Baohua, Shang Yong, He Wei, Li Xixia Zhang Xuezhen, Guo Xiaohong, Sun Liangting, Zhang Zimin, Zhao Huanyu Zhao Hongwei, Zhao Yongtao and Ma Xinwen.Atomic Physics Experimental Platform Operation Status in 2005[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2005(1):177-177.
-
6Li Jinyu Wang Pingzhi Sha Shan Sun Liangting Zhang Xuezhen Ma Xinwen Liu Huiping.Annual Operation Status of 320 kV HV Platform in 2007[J].近代物理研究所和兰州重离子加速器实验室年报:英文版,2007(1):188-189.
-
7C.H.YU AcceleratorCenter.The 1999/2000 Operation of Storage Ring for BEPC/BSRF[J].Beijing Synchrotron Radiation Facility,2001(1):158-161.
-
8Yue Min,Gou Shizhe,Wang Yongping,Yuan Chao,Ma Yuan.6-35 Establishment of HIRFL Collaborative Management Platform[J].IMP & HIRFL Annual Report,2015(1):311-312.