摘要
针对超千米深井磁西一号煤矿地压大、高瓦斯突出的特点,在以井巷工程为主,机电安装工程服从井巷工程,土建工程服从井巷工程和机电安装工程的原则下,按照施工区个数的不同,编制了2个可行性施工方案。综合考虑工期、安全、经济和现场施工等诸多因素,最终决定选用方案1施工。矿井建设施工期间,各阶段施工任务完成时间与方案1中预计时间基本吻合,基本可以按期完成施工任务,工期安排科学合理,达到了预期效果。
According to the high underground pressure and high gas outburst features of Cixi No. 1 mine with a mine shaft over 1 000 m depth, under the principle of the mine shaft and roadway engi- neering as the main. The electromechanical installation engineering obedient to the mine shaft and roadway engineering and the civil engineering obedient to the mine shaft and roadway engineering and the electro-mechanical installation engineering, two feasible construction plans were prepared based on the different construction block number. In comprehensive considerations of the construction period, safety, economic and site construction and other factors, finally No. 1 plan was selected and applied to the mine construction. During the mine construction period, the completed time of each stage construction assignment was basically fitted to the schedule time of No. 1 plan. The construction assignment could be completed basically, the construction period was scientifically rational and the estimated effect was reached.
作者
冀明
王镇
杨本生
JI Ming WANG Zhen YANG Ben-sheng(Yanzishan Mine ,Datong Coal Mine Group ,Datong 037037 ,China School of Resources, Hebei University of Engineering, Handan 056038, China)
出处
《建井技术》
2016年第6期5-8,38,共5页
Mine Construction Technology
关键词
超千米深井
施工组织设计
关键线路
井巷工程
矿井建设
over 1 000 m depth mine shaft
design on construction organization
key route
mine shaft and roadway engineering
mine construction