针对一起同塔并架线路遭雷击引发的220 k V变电站全停事故,阐述了事故发生的经过、起因及事故处理过程,指出了开关拒分、开关拒合、二次回路缺陷、保护拒动等多重设备缺陷导致此次事故的发生,分析了保护拒动原因,并提出了防范措施。
In this paper,through a 220 k V substation full stop accident caused by lightning,the course of events,cause and accident treatment are elucidated.Refusal operation of switch,secondary circuit defect,miss operation of line protection and other multiple equipment defects are pointed out.It analyzes the cause for the refusal protection and puts forward preventive measures according to the problems exposed.
作者
孙文涛
刘淼
李铁
张建
SUN Wentao LIU Miao LI Tie ZHANG Jian(State Grid Liaoning Electric Power Co., Ltd., Dispateh Control Center, Shenyang , Liaoning 110006 , China)
出处
《东北电力技术》
2016年第11期48-51,55,共5页
Northeast Electric Power Technology
关键词
多重设备
220
KV变电站
全站停电
事故处理
同塔并架
电网调度
multiple equipment
220 kV substation
power cut of all-station
accident treatment
parallel lines on same tower