期刊文献+

辽宁南部电网黑启动方案研究 被引量:1

Research on Black-start Scheme for Liaoning South Power System
下载PDF
导出
摘要 为了提高大面积停电情况下电网快速反应及恢复能力,全力保障辽宁电网安全稳定可靠运行,结合辽宁省内电源分布及运行实际需要,开展以太平湾电厂作为黑启动电源的可能性研究,基于PSCAD/EMTDC搭建黑启动过程电磁暂态仿真模型,针对黑启动过程中的自励磁问题、谐振问题、工频过电压、操作过电压及黑启动条件下辅机启动对电压的影响进行计算和分析,全面论证了太平湾电厂作为辽宁南部黑启动电源的可行性。 In order to improve quick response and recovery of power grid which is due to a large area blackout,combining with power distribution and operation requirement of Liaoning province,feasility study about Taiping bay power plant as black start power supply is carried out.The research is based on PSCAD/EMTDC to build the process of black start with electromagnetic transient simulation model.It is aiming for solving the issues on condition which are self-excitation,resonance,power frequency overvoltage,operating overvoltage and black start.In addition,with the condition of black start,it is essential to calculate and analyze the influence of voltage when auxiliary engine starts.This paper demonstrates the feasibility that setting Taiping bay power plant as a black start power supply in southern of Liaoning province.
作者 孙峰 刘凯 王印 程绪可 韩子姣 SUN FengI LIU Kai WANG Yin CHENG Xuke HAN Zijiao(Electric Power Research Institute of State Grid Liaoning Eleetric Power Co., Ltd., Shenyang, l,iaoning 110006, China State Grid Liaoning Eleclric Power Co., Ltd., Shenyang, Liaoning 110006, China)
出处 《东北电力技术》 2016年第12期1-5,共5页 Northeast Electric Power Technology
关键词 黑启动 自励磁 过电压 谐振 black start self-excitation overvoltage resonant vibration
  • 相关文献

参考文献7

二级参考文献35

共引文献151

同被引文献19

引证文献1

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部