摘要 麻家梁矿副立井担负矿井全部辅助提升任务,兼进风井和安全出口。为研究解决该立井当前存在的罐道连接螺栓松动问题,对副立井提升设备的工作情况进行了详细的分析;通过实地调查罐道与横梁连接处的工作情况,分析连接处受力情况,找出了造成连接螺栓松动的根本原因,并给出了具体的综合解决方案,经实践证明该方案很大程度上解决了罐道连接螺栓松动的难题。 The vice shaft of Majialiang Mine is responsible for all auxiliary lifting task, intake shaft and exit. For the problem of bolt loose check of cage guide in vice shaft, we analyze the operation situation of hoisting equipment of vice shaft in detail.Through the field investigation of connecting situation of cage guide and beam, we analyze the connection force, and find out the root reasons causing loose connecting bolts, and give specific integrated solutions. Practice has proven that the program largely solved the loose problem of road connecting bolts.
作者 王晨升 苏芳
出处 《煤矿安全》 CAS 北大核心 2017年第2期212-214,共3页 Safety in Coal Mines
关键词 副立井 提升设备 螺栓防松 受力分析 解决方案 vice shaft lifting equipment bolt loose check stress analysis solution
  • 相关文献

参考文献9

二级参考文献22

  • 1李俊良,沈英明,杜彦良.铁基形状记忆合金螺母防松摩擦力矩的表征[J].石家庄铁道学院学报,2004,17(4):30-33. 被引量:1
  • 2山本晃.螺纹联接的理论与计算[M].上海:上海科学技术文献出版社,1982..
  • 3袁家悻.Anti-looseness of the thread connection[J].Machinery Manufacturing Engineer(机械工艺师),1994,(4):9-11.
  • 4何红征.The looseness of thread connection and anti-loosing measures[J].Journal of South China University of Technology(华南理工大学学报),1995,8:43-47.
  • 5陈睿.The new-type anti-loosing nut-the concave convex type nut[J].Wuhan Steel technology(武钢技术),1996,34(30):37-40.
  • 6卜炎.螺纹联接的设计与计算[M].北京:北京高等教育出版社,1986..
  • 7王大伦 等.轴及紧固件的失效分析[M].北京:机械工业出版社,1987..
  • 8牧野·洋.自动机械机构学[M].北京:科学出版社,1980.
  • 9Zadoks R I,Yu X.An investigation of the self-Loosening behavior of bolts under transverse vibration [J].Journal of Sound Vibration,1997,208(2):189-209.
  • 10Zhang Ming,Jiang Yanyao.Finite element modeling of self-loosening of bolted joints [J].Journal of Mechanical Design,2007,129(2):218-226.

共引文献55

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部