摘要
为了解决深井破碎矿体开采中的支护问题,在两步骤回采充填采矿法中采用水压支柱进行护顶。工业试验表明,第一次加压后水压支柱的初始支撑力为9.4~13.2 MPa,支柱工作阻力在前3d内减小较快,之后缓慢减小;支柱高度均随支护时间的延长而缓慢下降,3d后顶板相对稳定。结果显示,水压支柱技术能有效提高破碎矿体开采过程的采场稳定性。
To solve the supporting problems in mining of fractured deep ore-body, hydraulic props are intro- duced to support the stope roof in two-step backfill mining. The industrial trial results show that the initial support- ing pressures of each prop are 10- 14 MPa after first pressure loading. The supporting resistances decrease dramat- ically before day 3 and decrease gently afterwards. In addition, prop heights decrease gently in the time frame of supporting, and the stope roof tend to be relatively stable after 3 days. The trial demonstrate that the roof support with hydraulic prop can effectively enhance the stope stability within the fractured ore-body during mining.
作者
姜振兴
黄明清
JIANG Zhenxing HUANG Mingqing(China ENFI Engineering Co. , Ltd. , Beijing 100038, China)
出处
《有色金属(矿山部分)》
2017年第2期95-98,共4页
NONFERROUS METALS(Mining Section)
关键词
破碎矿体
水压支柱
充填采矿法
支护特性
fractured ore-body
hydraulic prop
backfill mining method
support characteristics