期刊文献+

大型信息化项目创新管控机制研究 被引量:5

Research on innovation control mechanism of large informatization project
下载PDF
导出
摘要 针对电力企业信息化项目管控要求,创新性地提出了层次化的全生命周期信息化项目管控机制。该机制将信息化项目建设按层次进行划分,并在每一层引入针对性的资金投入、建设进度、开发质量、人员协调以及风险规避等措施,同时采用基于后评估机制的全生命周期管控模式,保障电力企业信息化项目的顺利开展以及质量和进度的严格控制,为大型信息系统的建设提供参考。 Aiming at the control requirement of the electric power enterprise informatization project, the hierarchical infor- mation project control mechanism with the full life cycle is proposed innovatively. The informatization project construction is di- vided with the mechanism according to the hierarchy, and the measures of capital investment, construction scheduling, develop- ment quality, staff coordination and risk avoidance are introduced into each hierarchy pointedly. The full life circle control mode based on post-evaluation mechanism is used to guarantee the successful development of the electric power enterprise informatiza- tion project and the strict control of the quality and scheduling, which provides a reference for the construction of the large infor- mation systems.
作者 吴石松
出处 《现代电子技术》 北大核心 2017年第7期116-119,123,共5页 Modern Electronics Technique
关键词 企业信息化 信息化项目建设 层次化管控 后评估机制 enterprise informatization informatization project construction hierarchical control post-evaluation mechanism
  • 相关文献

参考文献7

二级参考文献28

共引文献48

同被引文献33

引证文献5

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部