海河隧道复合釉面纤瓷板施工工艺及质量控制

On the Construction Process and Quality Control of the Composite Glazed Fiber Ceramic Plates for the Haihe River Tunnel
下载PDF
导出
摘要 天津中央大道海河隧道内墙壁采用复合釉面纤瓷板进行装饰,不仅增加了隧道整体的美观,而且还保证了主体结构的安全。介绍了复合釉面纤瓷板的安装施工工艺,以及在测量放线、骨架安装、面板安装等不同施工阶段易出现的质量问题及其防治措施。有利于提高工程施工质量,促进该项技术的发展。 The internal wall of the Haihe River Tunnel of the Central Avenue of Tianjin is decorated with composite glazed fiber ceramic plates,which not only help beautify the whole tunnel, but also ensure the security of the main structure of the tunnel. Introduced in the paper is the installation construction process of the composite glazed fiber ceramic plates,as well as the quality problems, which may occur at different construction stages such as the survey and layout stage, the framework installation stage and the facing plate installation stage,and the preventive and repairing measures. The paper may help improve the construction quality of projects, and promote the development of the technique.
作者 梁素琴 LIANG Suqin(The Fifth Engineering Co. Ltd. of the 18th Bureau Group of China Railway,Tianjin 300452,China)
出处 《国防交通工程与技术》 2017年第2期78-80,58,共4页 Traffic Engineering and Technology for National Defence
关键词 隧道装饰 复合釉面纤瓷板 安装 工艺流程 decoration of the tunnel composite glazed fiber ceramic installation flow
  • 相关文献

二级参考文献9

共引文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部