摘要
介绍了沈阳地铁10号线长距离下穿绕城高速公路工程的基本情况与设计方案,并采用三维数值计算模型,从公路路基沉降与匝道桥桩变形两方面,分析了矿山法下穿施工对高速公路的影响,得出了一些有价值的结论。
This paper introduced the basic situation and design scheme of Shenyang subway No. 10 line long distance underneath pass ring high-way engineering, and using 3D numerical calculation model, from the highway roadbed settlement and ramp bridge pile two aspects, analyzed the influence of mining method underneath pass construction to highway, obtained some valuable conclusions.
出处
《山西建筑》
2017年第6期177-179,共3页
Shanxi Architecture
关键词
地铁
高速公路
路基
桥桩
沉降值
subway, highway, roadbed, bridge pile, settlement value