摘要
根据呼延水厂二期工程中清水池项目的实际情况,将传统带伸缩缝的水池与新型带引发缝的水池进行了技术与经济方面的对比,并分析了清水池施工中的重难点,提出了相应的施工建议,以实现水资源的优化配置。
According to the fact of the clean-water reservoir in the second phase project of Huyan Water Plant,the paper analyzes the technical and economic comparison between the traditional pool with expansion joints and the new pool with the trigger joint,analyzes the construction key and difficult points of the construction,and points out the respective suggestions,so as to realize the optimal allocation of the water resources.
出处
《山西建筑》
2017年第5期51-52,共2页
Shanxi Architecture
关键词
清水池
伸缩缝
引发缝
抗渗性能
clean-water reservoir
expansion joint
trigger joint
anti-leakage performance