摘要
结合工具式组装外爬架的施工工艺流程,从支座预埋、架体安装、架体提升与拆除等方面,阐述了工具式组装外爬架在厦门嘉丽广场的施工操作要点,并提出了施工质控措施,指出工具式组装外爬架施工简便、材料循环利用率高,符合绿色施工的要求。
Combining with the construction process of tool type assembled external lifting scaffold,from the support embedded,frame installation,frame lifting and removal and other aspects,this paper elaborated the construction operation key points of tool type assembled external lifting scaffold in Xiamen Jiali Plaza,and put forward the construction quality control measures,pointed out that the tool type assembled external lifting scaffold construction simple,materials,recycling rate high,with green construction requirements.
出处
《山西建筑》
2017年第5期132-134,共3页
Shanxi Architecture
关键词
工具式组装外爬架
架体
支座
升降原理
tool type assembled external lifting scaffold
frame body
support
rise and fall principle