期刊文献+

纵向预应力对箱梁剪力滞效应影响研究 被引量:2

Research on Impact of Longitudinal Prestress on Shear-lag Effect of Box Girder
下载PDF
导出
摘要 纵向预应力对箱梁的作用本质上与轴向力存在着密切的关系,为研究轴向力及预应力作用下箱梁剪力滞效应及箱梁剪力滞的变化规律,基于剪力滞效应的原理,指出轴向力及纵向预应力作用下箱梁将产生剪力滞效应,运用有限元软件ANSYS对薄壁箱梁剪力滞效应影响进行数值分析,得到并总结剪力滞效应沿梁纵向分布的规律,可以为工程实践提供一定参考。 The impact of longitudinal prestress on box girder is closely related to axial force essentially. In order to study the change rule of shear - lag effect of box girder and shear lag of box girder under the impact of axial force and prestress, based on the principle of shear - lag effect, the shear - lag effect of box girder under the impact of axial force and longitudinal prestress is pointed out, the numerical analysis on the impact of shear - lag effect on thin - wall box girder is made by utilizing finite element software ANSYS, and the rule that the shear - lag effect should be distributed along the longitudinal direction is obtained and summarized, so as to provide certain reference for engineering practice.
作者 陈祯
出处 《北方交通》 2017年第3期38-42,共5页 Northern Communications
关键词 箱梁 纵向预应力 轴向力 剪力滞效应 有限元分析 Box girder Longitudinal prestress Axial force Shear-lag effect Finite element analysis
  • 相关文献

参考文献4

二级参考文献18

  • 1张士铎,王文州.荷载横向作用位置对箱型梁剪力滞效应的影响[J].湖南大学学报(自然科学版),1995,22(2):109-115. 被引量:22
  • 2郭金琼.箱形梁剪力滞效应分析[J].土木工程学报,1983,16(1):1-12.
  • 3Reissner E. Analysis of shear lag in box beam by principle of minimum potential energy [ J ]. Quarterly of Applied Mathematics, 1946,5 (3) :268 - 278.
  • 4WU Ya-ping, LAI Yuan-ming, ZHANG Xue-fu. A finite beam element for analyzing shear lag and shear deformation effects in composite - laminated box girders [ J ]. Computers and Structures,2004,82(9/10) :763-771.
  • 5LUO Q z, wu Y M, LI Q s. A finite segment model for shear lag analysis[J]. Engineering Structures, 2004, 26 (14) : 2113-2124.
  • 6WU Ya-ping , LIU Shi-zhong, ZHU Yuan-lin, et al. Matrix analysis of shear lag and shear deformation in thin - walled box beams[J]. Journal of Engineering Mechanics, ASCE ,2003,129, ( 8 ) :944 - 950.
  • 7吴亚平.薄壁箱梁剪力滞后及剪切变形双重效应分析.工程力学,1994,:425-428.
  • 8范立础.桥梁工程[M].北京:人民交通出版社,2001..
  • 9Reissner E.Analysis of shear lag in box beams by the principle of minimum potential energy[J].Q.Appl.Math.,1946,6(3):268-278
  • 10Moffatt K R,Dowling P J.Shear lag in steel box girder bridges[J].J.Struct.Engrg.,ASCE,1975,53:439-48

共引文献74

同被引文献7

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部