期刊文献+

设计潮位过程线新型计算方法在防洪排涝中的应用研究 被引量:1

The New Calculation Method of Design Tide Process is Applied Research in the Flood Protection and Storm Drainage
下载PDF
导出
摘要 外江(海)潮水位过程对河口滨海地区的防洪排涝影响较大,在该类规划设计中,需要确定承泄区合适的设计潮位过程。介绍了1种关于设计潮位过程线的计算方法,并在浙江省鳌江下游平原地区排涝规划得到应用。设计表明,该方法简洁高效,计算的设计潮位过程线有较好的实用性,达到预期效果,满足防洪排涝设计的要求。 The tide process influences the flood control and drainage in the tidal river mouth and coastal region,so it is necessary to determine the suitable design tide process of the drainage receiver.There are few studies about the design tide process,and we proposed an experience formula which is suitable for the flood control and drainage.This method has been applied in drainage planning of the Aojiang plains in Zhejiang Province. The result indicates that the method is concise and efficient;the design tide process obtained by this method is practical and achieves the desired effect which meets the requirements of flood control and drainage design.
出处 《浙江水利科技》 2017年第2期3-7,共5页 Zhejiang Hydrotechnics
基金 国家自然科学基金重点项目(40231017) 教育部博士点基金资助项目(2120101110108)
关键词 防洪排涝 潮型 潮位过程线 计算方法 flood control and waterlogging prevention tide type tidal level process the calculation method
  • 相关文献

参考文献2

二级参考文献9

共引文献17

同被引文献5

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部