期刊文献+

乌江思南新区段河道治理工程地质问题及评价 被引量:2

The engineering geological problems and evaluation for the riverway harnessing project of Sinan New District
下载PDF
导出
摘要 针对乌江思南新区段防洪工程勘察工作的开展,查明了该段河道两岸工程地质条件。并针对该区地质特征进行探讨,同时对影响该工程的主要工程地质问题进行评价及建议相应采取的工程措施。为设计和施工提供可靠的工程地质依据及类似工程积累经验。 The flood control project of Sinan New District is about the people's security in the new urban areas of Sinan, Guizhou. This study identified engineering geological conditions for both sides riverbank by investigation of proposed construction. The geological characteristics is discussed for this area. The main engineering geological conditions that affects the project is evaluated and corresponding engineering measures is suggested. This paper provides a reliable engineering geological basis and experience for the design and construction of similar experiences.
作者 丁亚龙 杨再任 杨伟 DING Ya-long YANG Zai-ren YANG Wei(Guizhou Survey & Design Research Institute for Water Resources and Hydropower, Guiyang 550003, Chin)
出处 《水科学与工程技术》 2017年第1期79-82,共4页 Water Sciences and Engineering Technology
关键词 乌江思南 河道治理 工程地质问题 Sinan, Wujiang riverway harnessing engineering geological problems
  • 相关文献

参考文献3

二级参考文献3

  • 1长江科学院.长江马鞍山河段一期整治工程可行性研究报告[R].武汉:长江科学院,1999.
  • 2水利部长江水利委员会.长江中下游干流河道治理规划报告[R].武汉:水利部长江水利委员会.1997.
  • 3吕丽君,李振青,刘小斌.长江马鞍山河段河道演变及整治研究[J].长江科学院院报,2009,26(12):13-16. 被引量:10

共引文献9

同被引文献4

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部