期刊文献+

油基钻井液施工工艺技术 被引量:8

OIL-BASED DRILLING FLUIDS APPLICATION PROCESSES
下载PDF
导出
摘要 针对油基钻井液在配制、转换、性能维护、回收、重复利用等施工工艺方面存在的现象及问题,通过室内评价实验、现场施工经验总结等方法开展了相关研究。研究表明,油水两相在较低黏度下充分乳化配制的油基钻井液具有较高的破乳电压值;高剪切速率下配制的油基钻井液具有较高的破乳电压值和较好的流变性;形成了双罐法和单罐法两种现场油基钻井液配制方法;随着油基钻井液中水相比例的增高,油基钻井液的乳化稳定性和流变性变差,可通过降低有机土加量、增加乳化剂加量,实现对低油水比油基钻井液流变和乳化稳定的调控;回收油基钻井液在重复利用前应做好乳化稳定和流变性的优化。形成的油基钻井液施工工艺技术在对现场操作人员具有较好的指导作用。 When applying oil-based drilling fluid on site,there appear some problems in the process of preparation,replacement,performance maintenance and recycling. Study has been done through evaluation experiments and field operation analysis. It is shown that the demulsification voltage value of oilbased drilling fluids is higher if the oil and water is fully emulsified at lower viscosity,and the WOB has a higher demulsification voltage and better rheology when prepared at a high shear rate. Two preparation methods are introduced,double-tank mehtod and single tank method. When water in OBM increased,the emulsion stability and rheology behavior become worse,measures of reducing organic soil amount and adding more emulsifier can be used to adjust to keep stable. It is very important to optimize the emulsion ability and rheology before recycling. These application processes of oil-based drilling fluids will be a good guide for field operators.
出处 《钻采工艺》 CAS 北大核心 2017年第2期82-85,共4页 Drilling & Production Technology
基金 中国石化科技开发重点项目“四川盆地深探井钻完井及测试关键技术研究”(编号:P16084) “高温高密度油基钻井液技术研究”(编号:P15009)
关键词 油基钻井液 施工工艺 乳化稳定性 流变性 油水比 oil-based drilling fluids application processes emulsion stability rheological properties oil-water ratio
  • 相关文献

参考文献9

二级参考文献103

  • 1岳前升,舒福昌,向兴金,史茂勇,黄红玺,张春阳,王权玮,于志杰.合成基钻井液的研制及其应用[J].钻井液与完井液,2004,21(5):1-3. 被引量:25
  • 2白小东,蒲晓林.国外保护储层的油基钻井完井液新技术研究与应用[J].精细石油化工进展,2005,6(12):12-14. 被引量:23
  • 3沈珺珺,迟晓元,杨庆利,赵宗保,张卫,秦松.生物柴油的研究进展[J].中国生物工程杂志,2006,26(11):87-90. 被引量:28
  • 4Chaco -Ley H. Transiet pressure analysis:finite conductivity fracture case versus damaged frecture case[ C ]. SPE 10179,1981:231 - 234.
  • 5Agarwal R G. Evaluation and performance prediction of low permeability gas wells stimulated by massive hydraulic fracturing[ J ]. JPT, 1996,24 ( 15 ) : 362 - 372.
  • 6Liao Yizhu, Lee W J, New solutions for wells with finite - conductivity fractures Including fracture - face skin : constant well pressure eases [ J ] . SPE28605, 1994:101 -103.
  • 7Liao Yizhu, Lee W J. New solutions for wells with finite conductivity fractures including wellbore storage and fracture - face skin[ J ]. SPE26912,1993:34 - 36.
  • 8Giger F M. The reservior engineering aspects ofhorizontal drilling[ J]. SPE13024,1992:45 - 47.
  • 9Joshi S D, et al. Augmentation of well productivity using slant and horizontal wells[ J]. SPEI5375,1987:69 -71.
  • 10Larsen L, Hegre T M. Pressure transient behavior of horizontal wells with finite conductivity vertical fractures[ J]. SPE22076,1991:23 - 25.

共引文献318

同被引文献59

引证文献8

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部