摘要 吊车梁的改造是既有厂房改造的重要组成部分。介绍了不采用临时支撑和托架对重型吊车梁进行改造的施工方法。该技术通过利用新安装的吊车梁作为支撑,采用动态同步的顶升方法,节省投资、缩短工期,同时具有一定的环境意义。 The reforming of crane beams is a signify cant component of existing plant transformation. The construction method of heavy-duty crane beam renovation is illustrated, in which the use of temporary supports and brackets could be avoided. The newly installed crane beam is used as supports, and thus, investment outlay and days for construction could be reduced by using dynamic synchronous jack-up method. In addition, this technology provides some environmental significance.
出处 《施工技术》 CAS 北大核心 2017年第6期125-128,共4页 Construction Technology
关键词 改造:托梁拔柱 吊车梁 无临时支撑 施工技术 reform supporting beam and removing column crane beam without temporary supports construction
  • 相关文献

参考文献5

二级参考文献36

  • 1沈涛,侯建国,张勇.民用建筑托梁拔柱加固技术的研究与应用[J].武汉大学学报(工学版),2003,36(z2):106-110. 被引量:1
  • 2东南大学 天津大学 同济大学.混凝土结构[M].北京:中国建筑工业出版社,2001..
  • 3.GB 50010—2002.混凝土结构设计规范[S].,..
  • 4.GBJ 17—88.钢结构设计规范[S].,..
  • 5YB9257-96.钢结构检测评定及加固技术规程[S].
  • 6中国建筑科学研究院.JGJ116-2009建筑抗震加固技术规程[s].北京:中国建筑工业出版社,2009.
  • 7四川省建筑科学研究院.GB50292-1999民用建筑可靠性鉴定标准[s].北京:中国建筑工业出版社,1999.
  • 8中国建筑科学研究院.GB50153-2008工程结构可靠性设计统一标准[S].北京:中国建筑工业出版社,2008.
  • 9中冶建筑研究总院有限公司.GB50144-2008工业建筑可靠性鉴定标准[S].北京:中国计划出版社,2008.
  • 10清华大学土木工程系.CECS77:96钢结构加固技术规范[S].北京:中国计划出版社,1996.